top of page
S545 Hero.jpg
S545 Unit Number.png

Under Construction

Speculative Build Warehouse/Logistics Unit

Available Q1 2026

S545 - 545,414 sq ft

Panattoni Swindon 545 located at Panattoni Park Swindon is a flagship industrial and logistics facility, setting new standards in scale and sustainability. With over 545,414 sq ft of premium cross-docked space, the unit is designed to meet the demands of modern logistics. Built to Net Zero Carbon standards and targeting BREEAM Outstanding, it delivers outstanding ESG performance. Ideally located to serve London and Southern England, this is a rare opportunity in a market with

limited availability at this scale.

 

Construction is underway with practical completion set for Q1 2026.

BG.jpg
1. Eaves.png

21m Clear

Internal Height

2. Level Doors.png

5 Level

Access Doors

3. Dock Doors.png

76 Dock

Loading Doors

4. Power.png

4.43 MVA 

Power from Grid

5. PV Power.png

PV Roof Mounted System

(Potential To Increase PV Power Generation)

6. PV Generation.png

189kWh/annum

PV Power Generation

(Estimated in Base Build)

7. HGV Spaces.png

134 Trailer

Parking Spaces

8. Floor Loading.png

50KN/M2

Flooring

9. Car Parking.png

414 Car

Parking Spaces

10. EV Charging.png

EV Charging

Points

11. Roof Lights.png

15% Roof Lights

to Warehouse

12. Yard Depth.png

50m Contained

Cross-Docked

Service Yards

S545

SQ FT

SQ M

Warehouse

514,411

47,789

Offices

21,861

2,030

Plant Deck

6,764

628

Entrance Area

2,062

190

Gatehouse

316

29

Total (GIA)

545,414

50,670

*All (GIA) measurements stated are approximate. Final measurements will be subject to verification upon completion (PC) and may vary as part of the final construction and fit-out process.

S545 Plan.png
BG.jpg
S545 Plan.png
1. Eaves.png

21m Clear

Internal Height

2. Level Doors.png

5 Level

Access Doors

3. Dock Doors.png

76 Dock

Loading Doors

4. Power.png

4.43 MVA 

Power from Grid

5. PV Power.png

PV Roof Mounted System

(Potential To Increase PV Power Generation)

6. PV Generation.png

189kWh/annum

PV Power Generation

(Estimated in Base Build)

7. HGV Spaces.png

134 Trailer

Parking Spaces

8. Floor Loading.png

50KN/M2

Flooring

9. Car Parking.png

414 Car

Parking Spaces

10. EV Charging.png

EV Charging

Points

11. Roof Lights.png

15% Roof Lights

to Warehouse

12. Yard Depth.png

50m Contained

Cross-Docked

Service Yards

S545

SQ FT

SQ M

Warehouse

514,411

47,789

Offices

21,861

2,030

Plant Deck

6,764

628

Entrance Area

2,062

190

Gatehouse

316

29

Total (GIA)

545,414

50,670

*All (GIA) measurements stated are approximate. Final measurements will be subject to verification upon completion (PC) and may vary as part of the final construction and fit-out process.

Ground CGI - S545.avif
S545 Unit Number.png

Get in Touch

Savils_Logo-1.png

Andrew Jackson
M: +44 (0) 7747 774 201
E: aljackson@savills.com

Jack Davies
M: +44 (0) 7901 853 503
E: Jack.Davies@savills.com

David Tew

M: +44 (0) 7779 860 176

E: David.Tew@savills.com

Mark Webster

M: + 44 (0) 7793 808 519
E: mark.webster@dtre.com

Jake Huntley
M: + 44 (0) 7765 154 211
E: jake.huntley@dtre.com

Max Dowley

M: +44 (0) 7548 773 999

E: max.dowley@dtre.com

James Watson
Head of Development for Southern England and London
E: JWatson@panattoni.com

Ethan Greene
Development Manager
E: EGreene@panattoni.com

Francesca Linnitt
Head of UK Marketing & Communications
E: Flinnitt@panattoni.com

bottom of page